ESC Committee
The SUDAS Erosion and Sediment Control (ESC) Committee has been reenacted and will start meeting to discuss revisions to SUDAS Design Chapter 7 and Specifications Section 9040. The files included below have not been approved by the Board of Directors and are merely DRAFT revisions to the SUDAS manuals.
- Design Info for ESC Measures (Section 7E-1)
- Filter Berms (Section 7E-3)
- Check Dams (Section 7E-7)
- Temporary Earth Diversion Berms (Section 7E-8)
- Temporary Sediment Basin (Section 7E-12)
- Sediment Traps (Section 7E-13)
- Silt Fences (Section 7E-14)
- Stabilized Construction Exit (Section 7E-15)
- Erosion Control Mulching (Section 7E-17)
- Rip Rap Alternatives (Section 7E-21)
- Greenspace and Buffer Areas (Section TBD)
- Stockpile Management (Section TBD)
- Silt Fence (Spec Figure 9040.119)
If you would like to print the whole packet, click here!
(The packet is set up to print double sided)
Page revised: May 4, 2022